New Search > Tiling > Waterproofing coatings > UNIDUR N

Tiling
Waterproofing coatings
Approx. 90-100 g/m² per coat, depending on the substrate.
Up to 24 months in the original, unopened container, stored at +5°C and +30°. Frost-resistant down to -5°C.
Absorbent substrates
Apply 1:1 water-diluted primer evenly in a thin coat using a foam or short-pile roller (coverage: approx. 100 g/m² per coat). Do not over apply and avoid puddle formation. Allow to dry for approx. 30 minutes. Several subsequent layers may be necessary to completely impregnate the substrate. After the primer has dried completely, over-coat with self-levelling compounds (drying time depending on the substrate absorbency, humidity, temperature conditions and quantity of the primer applied).
For anhydrite screed allow to dry for 24 hours before overcoating.
Impervious substrates
Apply undiluted primer evenly in a thin coat using a short-pile roller (coverage: approx. 90-100 g/m²). Do not over apply and avoid puddle formation. Allow to dry for approx. 60 minutes prior to over-coating with a self-levelling compound.
Smoothing and levelling compounds must be applied within 6 to 12 hours after primer application.
Anhydrite screeds
Check moisture content (it should not exceed 0.5%).
The surface of anhydrite screed should be sanded in order to eliminate traces of paints, mortars, plaster, etc. and suface layer of anhydrite screed.
Apply undiluted primer (coverage: approx. 100 g/m²) and allow to dry for at least 24 hours before application of self-levelling compounds.
REMARKS
- Underfloor heating systems must comply with current building regulations. Turn off the heating 48 hours before starting the work. The heating should be turned up to its operating temperatures gradually, in stages over 48 hours after laying the floor covering. Do not apply when underfloor heating is in operation.
- In all cases, always observe the drying time.
| Presentation | Bar code | Bostik code |
|---|---|---|
| jerry can - 20 kg | 3549210491439 | 047911 |